ConstructionFree guide Building work and renovations are stressful enough without finding out afterwards that the work was done without the right approvals, doesn't meet building regulations, or is simply defective. This guide explains your options and how to deal with it.
Use the free generator to draft a formal letter to a builder, contractor, or developer about non-compliant building work or a snagging list of defects.
Try the generator (free first document)In England, most building work has to be approved under the building regulations (set out in the Building Act 1984 and the building regulations themselves). The point of building control is to make sure buildings are safe, healthy, and energy-efficient — structurally sound, fire-safe, properly insulated, with safe electrical and plumbing work, etc.
Generally, the person carrying out the work, or the person in control of the building, is responsible for making sure the work is approved. There are a few routes:
Building control can be carried out by the local authority's building control team or by an approved inspector (a private provider) under a private building control arrangement.
Common situations people run into:
Before you complain, get a clear picture. For building control issues, the key question is: was the work approved, and does the completed work match what was approved? For defects, the question is: what is defective, is it structural/safety-critical, and what would it cost to fix? A qualified building surveyor or structural engineer can help here — and their report is also good evidence if you end up in a dispute.
If the builder or contractor is still around, put your concerns in writing. Be specific about what's wrong, with dates, locations, and evidence (photos, plans, the contract, the approved documents, and any independent report). State clearly what you want them to do: stop non-compliant work, arrange the right building control inspection/certification, fix the defects, and confirm in writing what they will do and by when.
If the work was done without approval and the builder won't co-operate, the local authority building control team is the relevant body. They can inspect the work, identify what doesn't comply, and tell you what needs to happen to regularise it. Bear in mind that regularisation can involve remedial work and fees.
For new-build homes, there is often a warranty and insurance policy such as NHBC Buildmark (or an equivalent from another provider). These can cover certain structural defects for a period (often 10 years for structural defects). If your property has a warranty, check what it covers and how to make a claim — the process and timescales matter.
If the matter can't be resolved, legal action may be an option:
These things are fact-specific and can be technically complex; a solicitor who specialises in construction or property disputes, or a surveyor, can be worth involving if the sums are significant.
Snagging is the process of listing the defects and incomplete items in a newly built or renovated property before you accept it as complete. A good snagging list is specific (room, location, what's wrong), distinguishes urgent defects from cosmetic snags, and is supported by photos. It's best done at the right stage — before you sign off the work or complete the purchase — because it's harder to raise things later.
The generator can produce a snagging letter listing the items, requesting a rectification programme, and reserving your rights under the contract and any warranty.
Use the LawImNotSure generator to draft your letter. It can help you structure a building control breach complaint or a snagging list in a clear, formal letter. Review the output carefully and attach any evidence you have. The generator does not provide legal advice.
For significant building control or structural defects, or a new-build dispute with a large developer, a building surveyor or a construction solicitor can be worth it. You can search for solicitors on this site — look for someone with construction or property dispute experience.